References
Clients who trust us
We work with power utilities, industrial facilities and distribution companies across Bosnia and Herzegovina, Serbia, Croatia, Romania and Italy.
8+Our clients
5countries
RS · BA · HR · RO · ITRegion
Our clients
Izvedeni radovi
- 01Supply: SF6 gas
- 02SF6 gas installation services
- 03Supply: spare parts for HV circuit breakers. Voltage levels: 6, 10 and 110kV
- 04Overhaul and maintenance works on HV circuit breakers. Voltage levels: 6, 10 and 110kV
- 05Moisture drying service in SF6 gas in 110/10kV substation zones and issuance of final testing protocol
- 06Fault diagnostics on GIS 123kV switchgear – Elixir Prahovo
- Disassembly and testing of voltage instrument transformers VT. Voltage level: 110kV (winding resistance, transformation ratio, dielectric loss factor tan δ)
- Preparation and primary testing of voltage instrument transformers VT = 63kV – 50Hz (110kV/√3)
- 07Overhaul and maintenance works on power transformer T1 in TS 110/10kV. Power: 31.5 MVA, transformation ratio: 110/10kV
- 08Diagnostics and testing of power transformer – voltage level: 110/10kV (winding resistance, insulation resistance, transformation ratio and magnetising current, tan δ, capacitance, dielectric breakdown strength of oil)
- 09Repair service for GIS 110kV switchgear in OHL bay 165
- Supply and installation of new insulation discs, assembly of switchgear components, evacuation and filling with SF6 gas
- SF6 gas leak testing (detection) and quality control
- Verification of all apparatus in OHL bay 165 (circuit breaker, disconnector, earthing switch, etc.)
- High-voltage testing at line voltage 50Hz, 70kV
- Preparation of reports on all completed works and performed tests
- Commissioning
- 10Supply and installation service: porcelain bushing 123kV – GIS switchgear TS 110/10kV Elixir Prahovo
- 11Supply and installation service: voltage instrument transformer VT – TYPE: UH 11-15, insulation level: 123kV, Manufacturer: Energoinvest Sarajevo
- Installation and assembly of 3 units – VT
- Supply of materials for connecting primary and secondary terminals of VT
- Connection of primary and secondary terminals of VT
- Commissioning
- 12Repair of air leaks in tap changer circuit breaker chambers. Voltage level: 110kV
Izvedeni radovi
- 01Overhaul and maintenance works – TS 110/6kV – Šabac 4
- Overhaul of busbar disconnectors – 3-pole – TYPE: HPG Energoinvest
- Overhaul of line disconnectors with earthing – 3-pole – TYPE: HPG Energoinvest
- Overhaul of oil circuit breakers 110kV – TYPE: HPGE 11A/16
- Overhaul of motor-spring drive with control and signalling installation
- Measurement of voltage drops on circuit breaker contacts
- Measurement of closing/opening synchronisation on circuit breakers
- Measurement of voltage drops on busbar and line disconnectors
- Checking of secondary connections on instrument transformers in the switchgear
- Checking of expansion membranes on instrument transformers in the switchgear
- Cleaning and application of silicone coating, checking of primary connections on surge arresters
- 02Overhaul and maintenance works on 6kV oil circuit breakers, TYPE: HG 6a/8c 630/1250A, Manufacturer: Energoinvest Sarajevo
- Service works on motor-spring drive of circuit breaker
- Inspection of arc extinction chamber
- Replacement of worn contact fingers
- Replacement of worn contact tips
- Replacement of worn arcing contacts
- Seal inspection and repair
- Checking of control and signalling installation
- Measurement of voltage drop, closing/opening synchronisation, dielectric breakdown strength of oil and insulation resistance
- Commissioning
Izvedeni radovi
- 01Overhaul and maintenance works on 6kV switchgear in GTS 1, 2 and 5
- 02Overhaul and maintenance works on 35kV switchgear in GTS 1 and 2
- 03Overhaul and maintenance works on 110kV switchgear in GTS 1, 2, 3 and 5
- 04Testing of VT – Voltage Instrument Transformers
- 05Testing of CT – Current Instrument Transformers
- 06Testing of power transformers
- 07Testing of main earthing systems: measurement of earthing resistance, step voltage, touch voltage
Elektrodistribucija Srbije
Izvedeni radovi
- 01Overhaul and maintenance works on MOP switchgear Beograd 110/10 kV - TS Obilić
- Evacuation of SF6 gas
- Dismantling of voltage instrument transformer – VT
- Dismantling of cable outlets (connector and cable connections)
- Preparation and inspection of new cable outlet for installation
- Installation of cable outlets with associated elements (new contact sockets, insulators and seals)
- Adjustment of linear travel of 110kV circuit breaker (measurement of contact transition resistance, closing/opening times, and inter-phase synchronism)
- Testing and installation of Voltage Instrument Transformer – VT - 110kV
- Testing of SF6 gas and filling with gas to nominal pressure in field E-2, with complete field testing.
- Replacement of silica gel, and inspection of circuit breakers and disconnectors in all fields of TS 110/10 kV – Obilić.
- Replacement of three-pole insulating discs
- Replacement of worn contacts and sockets on 110kV earthing switch.
- Replacement of core of Voltage Instrument Transformer – VT 110 kV.
- Replacement of worn contacts and sockets on voltage instrument transformer VT 110KV.
- Cleaning of cable outlet.
Izvedeni radovi
- 01Overhaul and maintenance works on HV switchgear. Voltage level: 6kV
- 02Overhaul and maintenance works on HV switchgear. Voltage level: 110kV
- 03Supply of spare parts for HV switchgear. Voltage levels: 6, 10, 35 and 110kV
Izvedeni radovi
- 01Supply of spare parts for power transformers. Voltage level: 110kV
- 02Overhaul and maintenance works on power transformers. Voltage level: 110kV
- 03Overhaul and maintenance works on power transformers. Voltage level: 10/0.4kV
- 04Overhaul of on-load tap changer of power transformer. Voltage level: 110kV
- 05Diagnostics and testing of power transformers. Voltage levels: 10, 35 and 110kV (winding resistance, transformation ratio and excitation current, tan δ, capacitance, leakage reactance, insulation resistance, moisture in cellulose insulation)
- 06Diagnostics and testing of instrument transformers VT and CT (winding resistance, transformation ratio, dielectric loss factor tan δ)
- 07Supply of spare parts for HV circuit breakers. Voltage level: 110kV
- 08Overhaul and maintenance works on HV circuit breakers. Voltage level: 110kV
- 09Construction and installation of enclosure fence for power transformer busbars. Voltage level: 110kV
- 10Continuous recording of voltage and current waveforms to determine flicker, harmonics, 3-phase RMS values of voltage and power, phase imbalance for voltage Uunb, current Aunb, Pst10', Plt2h at two connection points (110kV SRS Donasid and 30kV EAF)
- 11Service and testing of hydraulic control and regulation block for HV circuit breaker. Voltage level: 110kV.
- General overhaul of piston hydraulic drive with additional cylinder
- Visual inspection and disassembly of pipes
- Honing
- Hard chrome plating 20–25um.
- Polishing of inner bore to Ra 0.2 um.
- Front cover – finishing and insertion.
- 12Overhaul of MOP bottle. Part of control switching apparatus for HV circuit breaker management. Manufacturer: Electroputere Craiova, Romania. Voltage level: 110kV.
- 13Testing of main earthing systems: measurement of earthing resistance, step voltage, touch voltage.
Izvedeni radovi
- 01Overhaul and maintenance works on HV switchgear. Voltage level: 110kV.
- 110kV circuit breakers – Manufacturer: Elektroputere Craiova, Romania
- 02Overhaul and maintenance works on HV switchgear. Voltage level: 110kV.
- 110kV power transformer – Manufacturer: Elektroputere Craiova, Romania
- 03Overhaul and maintenance works on HV switchgear. Voltage level: 10/0.4 kV.
- 10kV power transformer – Manufacturer: Elektroputere Craiova, Romania
- 04Supply of spare parts for HV switchgear. Voltage level: 110kV.
- 05Transport preparation – Power transformer. Voltage level: 110kV – in accordance with technical and transport documentation.
- 06Installation of cable ducts and laying of main power supply cables for the substation.
- 07Connection works of the power transformer to the main substation, including installation of power cables/busbars, final termination, mechanical and electrical securing of connections, and functional testing prior to commissioning.
- 08Testing of main earthing systems: measurement of earthing resistance, step voltage, touch voltage.
Izvedeni radovi
- 01Overhaul and maintenance works on HV switchgear. Voltage level: 110kV.
- 110kV circuit breakers – Manufacturer: Elektroputere Craiova, Romania
- 02Overhaul and maintenance works on HV switchgear. Voltage level: 110kV.
- Replacement of control cabinets for disconnectors and earthing switches – full dismantling of existing equipment, installation of new cabinets, integration into the control system and functional verification. Manufacturer: Koncar Zagreb
Contact
Have a project or fault?
Contact us for expert consultation. We offer field interventions, service inspections and technical support for all Energoinvest equipment.
Working hours
Mon–Fri: 08:00–16:00
Address
Vladimira Popovića 26, 11000, Belgrade, Serbia




